How to write a Preliminary report to insurance company on losses due to natural hazard

Preliminary report is a written documents of any object when we present for Specific Purpose infront any client,office or other purposes.There are Various method to prepare report for specific task among them today i am going to post about how to write report for insurance company while there will losses occurs due to Natural Hazards like,Landslide ,Fire on any project.
Sample of Preliminary report for Insurance company to claim compensation of Losses due to landslide on Building construction Project (The Leaf Hospitality):


STEP-WISE  TIPS:

   Cover Page:

How to write a Preliminary report

Date:-1 st Sept 2017.
Prepared by: Er. Ghan Shyam Dhakal.

Table of Contents


    Project Overview

    The Leaf Hospitality, Nagarkot Hotel Project is a one of the luxurious Hotel in Nepal located at
    Kavre district at Baluwapati near Nagarkot View Tower with land coverage 80 ropani in
    mountainous terrain. The project is separated in three Phases namely Phase-1, Phase-1A &
    SPA. The Main objective of this project is to provide luxurious & hygienic life style within nature.

    The project’s Structure is totally based on RCC, Stones & Bricks as per drawings provided by
    Consultants.
     The Employer/Owner: The Leaf Hospitality.
     The Design Architect: MAP LLC.
     Executive Architect + Planner: Mathema and Partners Pvt.Ltd.
     Structure Consultant: MRB & Associates Pvt. Ltd.
     Electrical Consultant: G. Tech Pvt. Ltd
     Sanitary & Plumbing Consultant: Stupa Design & Associates Pvt.Ltd.
     The Contractor (Civil Construction Phase -1&Phase-1A): Contech Pvt.Ltd.
     The Contractor (SPA): New Anantadeep Construction Pvt.Ltd.

     The Contractor (MEP): Airtech Industries Pvt.Ltd.
     And Many More Contractors for different works.

    Scope of Works

    Scope of works comprises the following tasks to be completed:

     The Phase -1 project comprises Terrace villas-6nos, Duplex Villas-1 no., Forest Villas-3
    nos., Sky Villas-2 no’s, Wine Cellar, Cigar Lounge, Butler Huts-2 no’s and shop building.
     The Phase -1A project comprises Arrival Centre, Duplex villas, Garden villas, Terrace
    villas, Butler huts & BOH buildings. It also Contain Swimming pool & ABR chambers.
     The SPA Project Contains ayurvedic-1, ayurvedic-2, signature-1, signature -2, Beauty
    and pampering block, Arrival building, BOH for staffs and Tibetan singing bowl building
    which is constructed by Natural Stones with RCC Structures.
     Earth retaining structures like Stone masonry wall, Gabions wall & RCC Shear Wall are
    also constructed as per site conditions. Landscaping Location at Project Site

    The project is being constructed in mountainous terrain ,so Landslide is the major issue for this
    project .If landslide occurs here then Soil stability of land is totally unbalanced that makes
    existing structures weak.
    Major landslides occurred in this project due to heavy rainfall, which are:-
    Phase-1A:
    1.) Behind arrival center,
    2.) Under swimming pool area occurs in 15 th Aug 2017,
    3.) Under BOH-A/BOH-B Buildings,
    4.) Near ABR Chamber
    5.) Behind Plot -27 & plot-28.
    SPA:
    1.) At Arrival building,
    2.) Behind Signature-1 &signature-2 Blocks.

    Specifications for Item of Works, Units & rates as per Contract

    1.) Earthwork Excavation Works (M25)

    a.) Specification:
    Excavation of Roadways , Retaining wall and drain using mechanical equipment
    Including satisfactory cutting, grading , filling and Satisfactory disposal to the spoil pit(
    Specified by Client on one way distance 3.5 km from site )from the site including
    protection of services road using shoring on required area ,also including of Plant and
    equipment for cutting filling, transportation of earth disposal and filling far from site
    all complete the works of finishing level as specified in design and drawing or as
    directed by Project Architect/Engineer.
    b.) Unit: Cu.m.
    c.) Contract Rate: RS.275.00

    2.) Stone Soling

    a.) Specification
    Stone soling as directed by site engineer with minimum 200mm thickness.
    b.) Unit: Sq.m
    c.) Contract Rate: Rs.1275.00

    3.) PCC Works:

    a.) Specification:
    Providing & laying concrete for Plain Cement Concrete (nominal mix) PCC work using
    machine crushed metal of approved quality and grading of size below 20 mm in required
    proportions, approved sand, for various works as stated below at all lead & lift including
    machine mixing, laying, leveling, vibrating curing etc. complete (on site by mixer)
    2.1)1:3:6 (1 cement: 3 coarse sand: 6 graded stone aggregate 20mm nominal size) as
    directed by Project Manager / Engg‐ in‐ charge
    b.) Unit: Cu.m.
    c.) Contract Rate: Rs.12650.00

    4.) PCC for RCC Works (M25)

    a.) Specification:
    Providing and laying controlled reinforced cement concrete conforming to Grade M25,
    Nominal Mix (1:1:2) (IS 456‐1978) using Weigh Concrete Mixer at site at all levels, all
    heights, all floors, all shapes, all lifts, pumping as require, given below, using coarse
    sand, 20mm and down size coarse aggregates, including Mixing concrete admixture,
    all leads and all lifts, any shape & slope, vibrating, scaffolding, wherever necessary,
    curing as directed, hacking the exposed surface wherever required to receive plaster
    or floated steel toweled surface wherever specified. The rate shall include for
    providing recesses to slabs, walls, and columns and sleeves and / or openings in slabs,
    construction joints, sunk slabs, cantilever slabs, making holes in formwork for taking,
    out dowels etc. to the required shape, size and slope as shown in drawings & / or as
    directed by Site Engineer.
    b.) Unit: Cu.m.
    c.) Contract Rate: RS.18600

    5.) Form Work‐ Centering and Shuttering:

    a.) Specification:
    Formwork, shuttering, centering with 19mm thick waterproof ply for column ,
    foundation base, structure walls, Lintel, cantilever beam, floor beam, floor slab, slope
    roof slab, water tank etc. with necessary propping, scaffolding, staging, supporting
    inclusive of wedging and cutting holes for utility sleeves.
    b.) Unit: Sq.m.
    c.) Contract Rate: Rs.1015.00

    6.) TMT Thermex steel reinforcement bar (Fe‐500)


    a.) Specification:
    Providing and laying in position TMT Reinforcement Bars conforming IS‐1786,
    gradeFe‐415, in place (tested quality) in all categories and diameters including
    straightening, cutting, bending, hooking, binding with 18 gauge annealed binding
    wires double fold to tie the bars in position, welding and keeping it in position during
    concreting by means of stays, blocks, ties, spacers, chairs, hangers etc. complete at all
    heights
    / lift and depth etc. as per drawings and according to relevant IS codes. Note:
    Reinforcement including authorized chairs, spacers and hangers shall be measured in
    length of different diameters used in the work nearest to a centimeters and their
    weight calculated on the basis of standard weight. Wastage and unauthorized
    overlaps shall not be paid for. Binding wire will not be paid separately. Bar Bending
    schedule to be prepared & submitted by Contractor for payment certification.
    Contractor shall make the existing Reinforcement bar straight without any extra cost.
    b.) Unit: - Kg
    c.) Contract Rate: Rs.130.00

    7.) Stone Masonry Works

    a.) Specification:
    Providing, and Placing of stone masonry wall , Drainage wall and retaining wall up to
    6m height as specified in Drawing, design including 200 mm height soling, 100mm
    thick plain cement concrete in 1:3:6 and 1:3 cement sand mortar in super structure
    and used Geo textile to cover one side of retaining wall, Brest wall, wing wall and back
    filling works as per drawing , design, specification also Provide 100mm diameter HDP
    pipe weep hole as on 1.2 to 1.5 m spacing horizontally and vertically all complete
    works as directed by Project engineer/Architect. (Note: weep hole Slope is provided in
    1: 8)
    a.1) Stone masonry Retaining wall, Breast wall, Wing wall
    b.) Unit: - Cu.m
    c.) Contract Rate: Rs.11000.00

    8.) Gabion Works

    a.) Specification
    b.) Unit: Cu.m
    c.) Contract Rate: Rs.8715.00

    Preventive Structures for affected areas with total Cost:


    For Safety Purpose to prevent Massive land sliding problems in project we are constructing
    Earth retain structures in affected areas. Types of Earth retain structures and their estimated
    costs are described below:
    In Phase -1A project, to prevent land sliding behind Arrival Building area, Shear wall was
    Constructed which estimated cost is Rs. 491111.60
    To prevent land sliding under swimming pool area, Gabion wall is constructing which
    estimated cost is Rs 7142910.00
    To prevent land sliding under BOH-A & BOH-B area, Stone masonry retaining wall will be
    construction which estimated cost is Rs 6894527.50
    Debris removal from Bathroom and changing room plinth slab ,due to landslide from BOH
    Buildings .Which estimated Cost is Rs 44000.00
    To prevent land sliding behind plot-27& plot-28 area, Stone masonry retaining wall will be
    construction which estimated cost is Rs 4923105
    Similarly to prevent land sliding at ABR Chamber, Shear wall is constructing for this estimated
    cost is RS. 2080066.025
    In SPA Project, behind signature-1 & singnature-2, stone masonry retaining wall will be
    construction which estimated cost is Rs. 2867155.00

    And at arrival Building-SPA, stone masonry retaining wall will be construction which estimated
    cost is Rs 1026058.75
    Therefore; the Gross Amount expenses to construct structure is Rs 25468934.00
    In word: Two Crore Fifty four- Lakh sixty-eight thousand Nine hundred thirty four rupees
    Zero Paisa only.

    Quantity Estimation for Earth retains Structures

    S.N Work description Unit No Length Breadt

    h Height Quantity Remarks
    1 E/W Excavation Cu.m.         
    a Shear wall behind
    arrival   1 9 1.6 1.5 21.6
    b Gabion wall at road   1 24 3.5 2.5 210
    c Stone wall at BOH bldg.   1 39.5 3.5 2 276.5
    d Shear wall at ABR   1 31.37 0.8 2 50.192
    e Stone wall at arrival SPA   1 23 2.5 1.5 86.25
    f Stone wall at signature SPA.   1 24 3.5 2 168
    g. Debris removal at bathroom & Changing   1 10 8 2 160
    h Gabbion Wall at p- 27/28   1 34 3 2.5 255
    2 Soling Works sq.m.         
    a Shear wall behind arrival   1 6.7 1.2   8.04
    b Gabion wall at road   1 24 3   72
    c Stone wall at BOH bldg.   1 39.5 3   118.5
    d Shear wall at ABR   1 31.37 0.5   15.685
    e Stone wall at arrival SPA   1 23 2   46
    f Stone wall at signature SPA.   1 24 3   72
    g Gabbion Wall at p-27/28   1 33 3   99
    3 PCC (1:3:6) works Cu.m.         
    a Shear wall behind arrival   1 6.7 1.2 0.1 0.804
    b Gabion wall at road for swimming pool   1 24 3 0.1 7.2
    c Stone wall at BOH bldg.   1 39.5 3 0.1 11.85
    d Shear wall at ABR   1 31.37 0.5 0.1 1.5685
    e Stone wall at arrival SPA   1 23 2 0.1 4.6
    f Stone wall at signature SPA.   1 24 3 0.1 7.2
    g Gabbion Wall at p-27/28   1 33 3 0.1 9.9
    4 Formworks Sq.m         
    a Shear wall behind arrival   2 6.7   5 67 2 5   0.2 2
      Foundation   2 6.7   0.3 4.02 2 1.2   0.3 0.72
    b Shear wall at ABR   2 31.37   4.7 294.878 2 4.7 0.23   2.162
      Foundation   2 31.37 0.3   18.822
    5 M25 (1:1:2) Concrete Cu.m.         
    a Shear wall behind arrival above water Tank 1 6.5 0.2 5 6.5
     Foundation   1 6.5 1.2 0.3 2.34
    b Shear wall at ABR   1 31.37 0.23 4.7 33.91097
      Foundation   1 31.37 0.5 0.3 4.7055
    6 Reinforcement Kg.         
    a Shear wall behind arrival   2.5% of 8.84 7850   1734.85

    b Shear wall at ABR   2.5% of 38.6164 7 7850   7578.48 2
    7 Stone Masonry Cu.m.         
    a Stone wall at BOH bldg   1 39.5 2.5 6 592.5
    b Stone wall at arrival SPA   1 23 1 3.5 80.5
    c Stone wall at signature SPA.   1 24 2 5 240
    8 Gabion fabrication Work Cu.m       
    a Gabion wall at road   1 24 3 11 792
    b Gabion wall Behind p-27/28   1 33 2 8 528

    Cost Estimation for Purposed Structures:


    1. Shear wall behind Arrival Building near Water tank

    S.N Work description Unit Rate Quantity Amount Remarks
    1 E/W Excavation Cu.m. 275 21.6 5940
    2 Stone Soling Sq..m. 1275 8.04 10251
    3 PCC Cu.m. 12650 0.8 10120
    4 Formwork Sq.m. 1015 73.74 74846.1
    5 Reinforcement Kg 130 1734.85 225530.5
    6 M25 Concrete. Cu.m. 18600 8.84 164424
            TOTAL 491111.6

    2. Gabion wall under Swimming pool area at road

    S.N Work description Unit Rate Quantity Amount Remarks
    1 E/W Excavation Cu.m. 275 210 57750
    2 Stone Soling Sq.m. 1275 72 91800
    3 PCC Cu.m. 12650 7.2 91080
    4 Gabion wall Cu.m. 8715 792 6902280
            TOTAL 7142910

    3. Stone Masonry wall at BOH-A& BOH-B building

    S.N Work description Unit Rate Quantity Amount Remarks
    1 E/W Excavation Cu.m. 275 276.5 76037.5
    2 Stone Soling Sq.m. 1275 118.5 151087.5
    3 PCC Cu.m. 12650 11.85 149902.5
    4 Stone Masonry

    Wall Cu.m 11000 592.5 6517500
            TOTAL 6894527.5

    4. Shear wall at ABR Chamber

    S.N Work description Unit Rate Quantity Amount Remarks
    1 E/W Excavation Cu.m. 275 50.19 13802.25
    2 Stone Soling Sq.m. 1275 15.685 19998.375
    3 PCC Cu.m. 12650 1.57 19860.5
    4 Formwork Sq.m. 1015 318.01 322780.15
    5 Reinforcement Kg 130 7579.175 985292.75
    6 M25 Concrete. Cu.m. 18600 38.62 718332
            TOTAL 2080066.02

    5. Stone Masonry wall at arrival SPA

    S.N Work description Unit Rate Quantity Amount Remarks
    1 E/W Excavation Cu.m. 275 86.25 23718.75
    2 Stone Soling sq.m. 1275 46 58650
    3 PCC Cu.m. 12650 4.6 58190
    4 Stone Masonry

    Wall Cu.m 11000 80.5 885500
            TOTAL 1026058.75

    6. Stone wall below signature-1& Signature-2 Block SPA.

    S.N Work description Unit Rate Quantity Amount Remarks
    1 E/W Excavation Cu.m. 275 161 44275
    2 Stone Soling sq.m. 1275 72 91800
    3 PCC Cu.m. 12650 7.2 91080
    4 Stone Masonry

    Wall Cu.m 11000 240 2640000
            TOTAL 2867155
    7. Earthwork excavation to remove debris at Bathroom & Changing room below BOH Buildings
    S.N Work description Unit Rate Quantity Amount Remarks
    1 E/W Excavation Cu.m. 275 160 44000
            TOTAL 44000

    8. Gabion wall under Swimming pool area at road

    S.N Work description Unit Rate Quantity Amount Remarks
    1 E/W Excavation Cu.m. 275 255 70125
    2 Stone Soling Sq.m. 1275 99 126225
    3 PCC Cu.m. 12650 9.9 125235
    4 Gabion wall Cu.m. 8715 528 4601520
            TOTAL 4923105

    Reference Photos of affected areas

    1.) Project Master Plan in 3D

    2.) Landslide behind Arrival Building above water tank in Phase1-A.

    3.) Landslide under Swimming pool area near road in Phase1-A.

    4.) Landscape between BOH-A& BOH-B area near DG Room at Phase1-A.

    5.) Landscape at ABR Chamber in Phase1-A.

    6.) Landslide at Arrival Building in SPA.
    7.) Land Crack appeared, so maximum chances for landslides in between
    signature-1 & Signature-2 Block SPA.

    Post a Comment

    0 Comments